Not much has to be done, recent work at the main building, the fence is in the process laying bricks, a second building work temporarily suspended ...
Also starting to get ready a few minor things that decorates whole.
Now, some pictures, showing all the details and several dioramas.
So, all the curbs, including the pavement ready for painting.
The second pillar of the barrier, almost ready.
I replaced all the screws (rivets), the base of the two pillars.
...and other illustrative images.
wtorek, 26 kwietnia 2011
poniedziałek, 18 kwietnia 2011
środa, 13 kwietnia 2011
underway 4 - tiles construction
Begin to lay the tiles on the roof.
I chose a different variant of the tiles, the previous selection had a little trouble
may be the next project will use previous selection.
Gutter is not finished, needs some improvements.
I chose a different variant of the tiles, the previous selection had a little trouble
may be the next project will use previous selection.
Gutter is not finished, needs some improvements.
czwartek, 7 kwietnia 2011
underway 4 - roof construction
Work on the diorama are moving at a normal pace
I did the roof construction
a few things I have to improve :)
I want to do something similar to this roof:
I did the roof construction
a few things I have to improve :)
I want to do something similar to this roof:
poniedziałek, 4 kwietnia 2011